Aerial view of a completed Techsync residence in Narok at sunset

From foundation to handover.

A design-and-build contractor in Kitengela. We put up the structure, then finish it — ceilings, floors, steel, paint and gutters — without handing your site between contractors.

NCA7  Reg. 95200/B/0825
EBK  B15660
Building since 2019

One contractor, from the first setting-out peg to the last coat of paint.

Most builds lose time in the handover between trades. Techsync carries the structural work and the finishing on one programme, so nothing waits on a contractor who hasn't arrived yet. We work across Kajiado, Nairobi and Narok, on homes, rentals, commercial units and boundary walls.

What we build

Every structure follows the same order. We carry it right through.

  1. Stage 1

    Foundation works

    Setting out, excavation, hardcore, blinding, footings and the concrete foundation base.

  2. Stage 2

    Walling

    Substructure and superstructure walling in machine-cut stone or block, up to ring beam level.

  3. Stage 3

    Concrete works

    Columns, beams, suspended slabs and staircases — reinforcement, formwork, casting and curing.

  4. Stage 4

    Roofing works

    Roof structure, trusses and cover in mabati, tiles or stone-coated sheets, ready for gutters.

Our work

Three recent builds, from the first excavation to handover.

Narok residence

Narok County · 2025–2026 · four-bedroom home

A full build on a cleared site: reinforced foundations, machine-cut stone walling, timber roof structure with stone-coated cover, then the complete finishing package including ceilings, steel windows and the perimeter wall.

Steel reinforcement laid for foundation footings on the Narok site
Foundation reinforcement
Machine-cut stone walling under construction
Stone walling
Timber roof trusses erected over the completed walling
Roof structure
Aerial view of the completed stone-coated tile roof
Roof cover complete
Finished interior with gypsum ceiling and steel windows
Interior finishes
Completed residence lit at night showing pillars and gables
At handover

Kiserian bungalow

Kajiado County · 2021 · bungalow

Built from open ground on a greenfield plot. Strip footings cast in the excavated trenches, foundation walling brought up to oversite level, then block walling and the roof structure.

Excavated foundation trenches with concrete strip footings cast
Excavation and strip footings
Foundation walling filled and levelled to oversite
Oversite fill and level
Block walling under construction on the bungalow
Walling in progress
Completed walling with timber roof structure erected
Walling and roof structure

Kitengela maisonette

Kitengela, Kajiado County · two-storey maisonette

A two-storey home built in phases. Precast beams and blocks set out on site, ground floor walling in dressed stone, then the upper floor, plaster and steel window installation.

Precast slab beams and blocks stacked on site before use
Precast beams and blocks on site
Ground floor walling with concrete columns cast in place
Ground floor walling
Two-storey maisonette exterior with dressed stone and plaster
Second floor and plaster
Completed maisonette elevation with steel windows fitted
Steel windows fitted

Finishing works

The stage where a building becomes a home. Taken on as a full package, or as single trades on a house someone else built.

Ceiling works

Gypsum and PVC ceilings, cornices, bulkheads, cove lighting and drop ceilings, including repairs and replacement.

Flooring works

Floor screeding, tiling, skirting and floor finishes for interiors, terraces and wet areas.

Steel fabrication

Gates, grilles, window and door frames, staircases, balustrades and canopies — fabricated and fitted.

Paint works

Surface preparation, filling, undercoat and finish coats for interior and exterior walls, plus repainting.

Gutter installation

Rainwater gutters, downpipes, fascia and connection to your rainwater harvesting tank.

Full finishing package

Ceiling, floor, paint and fittings on one programme, on a labour-only or supply-and-fit basis.

Gypsum ceiling with recessed cove lighting
Gypsum ceiling and cove lighting
Arched steel entrance doors in a stone facade
Arched steel entrance doors
Fabricated steel door fitted into a concrete opening
Steel door, fabricated and fitted
Steel window frames fitted in an external wall
Steel window frames

Boundary walls in Kitengela

Securing a plot is usually the first build on it. We construct perimeter walls, gates and fencing across Kitengela, Isinya, Kajiado and Narok — on plots with or without an existing structure.

  • Stone perimeter walls with columns and copings
  • Precast concrete panel walls
  • Strip foundations for boundary walls
  • Steel gates, sliding gates and gatehouses
  • Electric fence and razor wire mounting
  • Plot beaconing, setting out and levelling
  • Chainlink and razor fencing for larger parcels
  • Wall plastering and painting
Boundary wall foundation set out along the plot edge
Wall foundation set out
Stone boundary wall under construction with site machinery
Perimeter wall under construction
Completed stone perimeter wall at sunset
Completed perimeter

Where we work

Based in Kitengela, working across Kajiado, Nairobi and Narok counties. Site visits within Kajiado are usually arranged within a few days.

KitengelaIsinyaKajiado townKiserian Ongata RongaiNgongAthi RiverNarok town SuswaNairobi

Get a quote

Send us the location and what you are building. A drawing helps, but a description is enough to start.

Phone and WhatsApp
+254 716 230 622
Base
Kitengela, Kajiado County
Chat on WhatsApp Send an email

WhatsApp is the fastest way to reach us. Photos of the site or plot are welcome.